mraine8
14
Ive attached a quick 1 min recording of the problem.
Essentially I have been playing around with the workflows for a long time and i just cant get it to correctly rearrange the previous order numbers as I need. In the video whatever is wrong with my workflow i end up with multiple order numbers of the same number. I was wondering if you could use the video to have a look at the way i constructed the workflow as you mentioned you’ve done heaps of drag and drop features before. I have the order numbers obviously displayed in the repeating group. Video here: video1504886983.mp4 - Google Drive