I have a list of projects assigned to each project manager; I want to draw a line between each Project Manager’s project, so it’s easier for them to see their projects. This is a table, not a RG.
I feel like the table comes with that line. Editing the horizontal separators would work for your case?
True, but I don’t want the line between every single row, only between Project Managers and their projects. Some PMs might have 1 project row, some might have 5, some might have more, I just need a visual distinction between projects that belong to each PM.
This topic was automatically closed after 70 days. New replies are no longer allowed.

