Hi All,
So I’m having some difficulties and couldn’t find any solutions on the forum so here goes.
Basically I have two data types (Project & Requests) there is a text reference linking the two. Within the Requests type I have 4 numerical fields (value#1 - 4) representing periodic budgets.
Within requests you can have multiple entries with the same project reference (multiple budget requests for the same project)
I want to be able to sum all the numerical values in the requests data type that has a particular project reference.
Hopefully this makes some sense to others, and thanks very much in advanced for the support.
Cheers